In
1998 I was contracted by Malcolm Jones to design, make the molds for,
and cast five acrylic arches, 5 feet wide and varying in length from 16
feet to 20 feet, for Surfhenge,
a surf commemorative commissioned by the Port of San Diego for the city
of Imperial Beach. Casting completed in October 1998.
Installed July 1999. |
|
 |